Whether it's a single LV service feeding a new build or a run of 33kV triplex through a live substation, we pull, terminate and joint cable to DNO, ICP and ENA specification.
Tension-controlled, drum-to-drum pulling using the right kit for the run — not whatever's left in the yard.
From tight duct runs through congested urban footways to open-field installations of 500m+, we plan every pull around the manufacturer's maximum tension and sidewall pressure. Rollers, swivels, cable lubricant and dynamometers — all in-house, all calibrated.
Certified jointers covering heat-shrink, cold-shrink and resin systems across polymeric (XLPE/EPR) and paper-insulated (PILC) cables.
Every joint is photo-recorded at each stage and handed over with a full joint report. When things go wrong on jointing jobs, it's almost always because somebody skipped a step — we don't.
Route walk, duct proving, bend radius check, tension calcs. We'd rather spend a day planning than a week redoing.
Traffic management, rollers set, drums positioned, protection mats down, live service awareness briefed.
Controlled winch, live tension data logged, comms at the drum and at the winch end throughout.
Joints built clean, then VLF / insulation tested and handed over with full documentation.